> For the complete documentation index, see [llms.txt](https://docs.imperialcad.app/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.imperialcad.app/panels/dot-panel/crews/assignments-and-assets.md).

# Assignments & Assets

Crew assignments are flexible. Asset assignments are intentionally strict.

{% tabs %}
{% tab title="Operational records" %}
A crew may be attached to multiple work orders, tow requests, or road closures. Multiple crews may also share the same operational record.
{% endtab %}

{% tab title="Assets" %}
One crew may have one asset, and one asset may belong to one crew. The existing assignment must be cleared before either side can receive a replacement.
{% endtab %}
{% endtabs %}

## Example

Crew 12 can be assigned to both a road closure and the work order connected to that closure. Crew 12 cannot have Truck 4 and Arrow Board 2 assigned as separate assets at the same time if both are tracked as assets under the one-asset rule.

{% hint style="info" %}
Crew status and asset status are separate. A crew may be Out of Service while its asset is in Maintenance, for example.
{% endhint %}
